Well some of the glue is still drying from my tree planting party I had
today. Here is the latest batch of the updated photos of the work I have
completed. Hope that you all enjoy.
This is a N scale layout loosely based off the Central of Georgia C line that ran from Chattanooga to Griffin and on to Macon GA. The section that I chose to model is part of the line that ran from Newnan, to Griffin, GA. I chose this line to model due to my interest in the C.G. and it is close to where I grew up. The time period of the layout is Jan. 1950 to June 12, 1963. This will allow me to run steam and all of the diesels that the C.G. owned and operated.
Saturday, December 8, 2012
Sunday, December 2, 2012
Well as of late, I have been busy working and doing family things and
not completed much time on the layout. But I have completed the segment
of the road that is part of the section that I am working to get semi
complete soon as possible. In the following photos, you will see that I
have painted my side walk and got the road completed. In the last photo,
you can see a rather large gap between the road and the tracks, still
undecided as to what I am going to do to that area. I may leave it open
or drop some buildings in it. There are some other areas that are in the
same undecided stage. But the next step is to mix up the India ink wash
and "pave" the roads and get side walks installed and "plant" the
buildings.
Subscribe to:
Posts (Atom)